Product Calculators Header
Products & Services

Use our easy calculators to estimate building materials costs

The first step in estimating building materials costs is determining the exact amount of building materials your project will require. CEMEX USA has made it easier to navigate this crucial step by providing several building materials calculators that can help you determine exactly how much concrete, aggregates/asphalt, and block building material you will need.


Ready Mix Materials Calculator

The calculator will estimate the volume of concrete or aggregate needed for your project.


To use the calculator:

  • Choose units of measure: English or Metric.
  • Enter the width, length, and thickness of the project.
  • Select whether you are measuring thickness in feet or inches.
  • Click Calculate.

The Ready Mix Materials Calculator
Choose Units: English   Metric
Length:
Width:
Thickness:

Total Volume =

Aggregates/Asphalt Materials Calculator

The Tonnage Calculator will estimate the approximate tonnage of aggregates and asphalt needed for your project, as well as the volume of dirt to be removed.


To use the calculator:

  • Choose units of measure: English or Metric.
  • Enter the width, length, and thickness of the project.
  • Select whether you are measuring thickness in feet or inches.
  • Click Calculate.

The Tonnage calculator
Choose Units: English Metric
Length:
Width:
Paving Thickness:
Compacted Stone Depth:
Depth of Dirt to be Removed:

Area =
Asphalt =
Stone =
Dirt =

Block Calculator

Use the block calculators below to calculate the amount of materials needed.


Block required
Length (ft)
Height (ft)
Total Block Required:
(add approx. 5% to the total for waste)
Mortar bags needed for block count
Block count
Mortar Bags Required:
(add approx. 5% to the total for waste)
Sand amount needed for block count
Block count
Sand (tons) Required:
(add ½ yard to the total amount you will need)
Wall reinforcing (Ladder or Truss type)
Block count
L.F. Type
16" 24"
Linear Feet Required:
(add approx. 5% to the total for waste)
Block fill
Block count
Block Size
6" 8" 12"
Cubic Yard Required:
(add ½ yard to the total amount you will need)
Zonolite type fill
Wall (sq ft)
Block Size
8 inch 12 inch
Bags Required:
(add approx. 5% to the total for waste)
Request Quote by Product

Request Quote by application

Videos